Cost and schedule overruns in large hydropower dams: an assessment of projects completed since 2000

Judith Plummer Braeckman*, Tim Disselhoff, Julian Kirchherr

*Corresponding author

Publikation: Bidrag til tidsskriftTidsskriftartikelForskningpeer review

Abstract

This paper presents novel data on cost and schedule overruns in recent dam projects started and completed since 2000 and compares them with pre-existing data sets on projects started before 2000. Combining these data, a meta-data set was created of 184 cost overrun and 191 time overrun data points. For post-2000 projects, the average cost overrun was 33% and schedule overrun was 18% as compared with 46% and 37% respectively for pre-2000 projects. While a decrease in the averages was observed, the change in cost overruns is not statistically significant, whereas the change in time overruns is significant.
OriginalsprogEngelsk
TidsskriftInternational Journal of Water Resources Development
Vol/bind36
Udgave nummer5
Sider (fra-til)839-854
Antal sider16
ISSN0790-0627
DOI
StatusUdgivet - 2020
Udgivet eksterntJa

Emneord

  • Large dams
  • World Commission on Dams
  • Cost and schedule estimates
  • Forecasting
  • Hydropower